Just before Christmas 2015 we got the plans approved by SPANC to install the sand filter that for some reason wasn't where they said it was in the original report.

Following this, we got a man in to do the work.

Next Page >

Whilst doing that, a load of soil needed to be disposed of so we took advantage of that and, with a drainpipe at the bottom to let the water flow, filled in the drainage ditch so we can get to teh other garden without the need to jump over a ditch.

Finally, whilst the diggers were there, we got the roots scrapped away and gravel laid under the lean to and down the side of the barn

Finally planning permission was approved!!!!!!

Next Page >